| The simple answer is that if the work to be done is over $500 OR if you are building a
fence OR a structure (i.e. shed, garage, addition) you need a building
permit. Some projects require additional items and time so
please PLAN AHEAD. Please contact
the Engineering Department if you have questions. |
|
back
to top |
Where
do I go to get a Permit?
|
Building permits can be obtained through the City
Engineering Department.
A building permit application can be obtained by either calling or
visiting our department, or you may download a
Building
Permit Application (.pdf document) here.
Demolition permits are also required. Please click here
for a Demolition
Permit Application (.pdf document)
|
|
back
to top |
|
|
| Most RESIDENTIAL building permits cost between $15.00 and
$20.00. If a variance or conditional use permit is needed, there are
additional costs. COMMERCIAL building permits are based on the
1988 UBC Schedule.
Click here to view
the schedule. ALL Commercial permits do require a Plan Inspection Fee
and State Surcharge. |
|
back
to top |
|
|
A survey is required when:
- Building a
fence
- Building a
garage
- Any construction outside existing building foundation footprint
- Any new construction
|
|
back
to top |
|
|
| Fences can be built on the property line if there is WRITTEN
neighbor consent. Consent forms are available from the Engineering
Department. |
|
back
to top |
|
|
| City Code, Chapter 11, Section 11.50 Subd. 10
requires that a building permit be issued for most work done to your
property.
This is to ensure that
your project meets the guidelines of the City and State regulations, and
to help you with any questions or concerns that may arise during the
building process.
|
|
|
Various Forms
(Please note, all forms are in .pdf format)
|
|
Deck &
Porch Packet
Information and forms required to construct a deck. |
|
Structures & Accessory
Buildings Information and forms required to construct a structure or
accessory building. |
|
|
|
|
|
Fence &
Wall Packet
Information and forms required to construct a fence.
|
|
Building
Permit Application
Building Permit required if cost of work exceeds $500.00
|
|
|
|
|
|
Sign Permit
Information and forms required to put up a sign. |
|
|
|
Utility
Verification Form
Before any construction is to begin, you must have this form filled out
and signed by the Public Utilities Department
|
|
Variance Certification Form When building fence ON property line
neighbor must sign this form.
When applying for a variance, it is a good idea to ask neighbor to sign
one. But variance is NOT contingent upon them signing it.
|
|
|
|
|
|
Demolition Packets
(IRR Applicants AND Private Applicants)
Information and forms required to demolish a structure. Also
includes forms for IRR Demolition Program |
|
Utility Permit
Application Application for permit for installation of Utilities, Driveways,
Crosswalks, or for placing of obstructions on City Property.
|
|
|
|
|
|
CONSTRUCTION PAMPHLETS & HOW TO's |
|
Variance Application
Required if you would like to construct/build within the required setbacks
|
|
|
|
|
|
Change of Zoning Requests (.pdf document) |
|
Mechanical Permit Application For Mechanical Permits |